top of page
Search

SNOW REMOVAL AT TOWNHALL AWARDED

  • cindyshevich
  • Dec 20, 2024
  • 1 min read

Updated: Jan 30, 2025

One bids was received: RK Construction bid $95.00 per time. A motion was adopted to accept the Quotes from RK Construction.

 
 
 

Recent Posts

See All
Gravel Quotes Results - 2026

Deer River Township received two (2) quotes for the 2026 gravel hauling and spreading project. The contract was awarded to Wm. J. Schwartz & Sons, Inc.  with a bid of $16.00 per cubic yard . The secon

 
 
 

Comments


bottom of page