Deer River Township is seeking quotes for the construction of an attached canopy over the front paved sidewalk at the Deer River Township Hall, located at 41183 County Road 19, Deer River, MN. This project is part of a grant application process and will only proceed if grant funding is awarded.

Project Scope & Specifications

  • Canopy Size: Approximately 31’10” × 20’, covering the full length of the existing front sidewalk.

  • Roof Structure:

    • Roof pitch must match the existing Township Hall roof.

    • Asphalt shingles matching the existing building.

  • Support Structure:

    • Treated wood posts.

    • Open beam / exposed wood ceiling construction.

  • Construction Details:

    • Wood interior finish with open beams acceptable.

    • Minimum clearance height: 9 feet.

    • Frost-depth concrete footings required.

    • Must meet all Minnesota snow load and wind load requirements.

  • Additional Features:

    • Gutters and downspouts.

    • Basic outdoor-rated lighting installed under the canopy.

  • Timeline:

    • Work is anticipated to be completed in 2026, pending grant approval.

Insurance Requirements: A Certificate of Workers’ Compensation Insurance and Contractor Liability Insurance with minimum coverage of $1.5 million must be included with the quote.

Submission Instructions: Quotes are due January 15, 2026, at 7:00 p.m. and must be mailed to: Deer River TownshipPO Box 122Deer River, MN 56636

The Deer River Township Board reserves the right to reject any and all quotes.

 
 
 

Recent Posts

See All
QUOTES FOR TWP HALL ROOF REPLACEMENT

Bids received: Brian Canfield: $31,875.00, Hoffman Weber Construction: $24,389.00, MN Roofing Company: $33,431.53, Priority Construction...

 
 
 
2025 Snow Removal Contract

The Deer River Township Board has awarded the 2025 Snow Removal Contract  to RK Construction .RK Construction submitted the lowest qualified bid at $135 per time  for snow plowing and shoveling at the

 
 
 
Still Seeking Quotes for Snow Removal at Hall

Deer River Township is still accepting quotes for plowing and shoveling at the Deer River Township Hall, as needed, for Winter 2026 . The parking lot and sidewalk shall be cleared with each snowfall a

 
 
 

Comments


bottom of page