2022 Gravel Quotes Received

  • cindyshevich
  • Feb 22, 2022
  • 1 min read

Updated: Apr 21, 2022

Winning Quote - RK Construction $15.45 per cubic yard

1000 cubic yards of Class 5 gravel to be hauled & tailgate spread to provide 4-6" loose lift at various locations on Deer River twp roads. Gravel must meet Itasca County specifications. Must be able to haul & spread after road restrictions are lifted & before 9/15/2022. Emergency deliveries within 24 hours.

 
 
 

Recent Posts

See All
Gravel Quotes Results - 2026

Deer River Township received two (2) quotes for the 2026 gravel hauling and spreading project. The contract was awarded to Wm. J. Schwartz & Sons, Inc.  with a bid of $16.00 per cubic yard . The secon

 
 
 